Power Velocity Infrastructure develops behind-the-fence power solutions across Ontario — pairing gas-fired generation assets directly with large compute and industrial loads. No grid bottlenecks. No interconnection queues.
Ontario's grid capacity constraints are a growing obstacle for energy-intensive industries. Interconnection queues stretch years. Transmission upgrades lag demand by a decade.
Power Velocity's approach removes the grid from the equation — connecting verified gas-fired generation assets directly to high-load tenants through a Behind-the-Fence arrangement. The tenant executes a direct PPA with the generator. Power Velocity delivers the land, zoning, fibre, and development management.
The result is a power delivery path measured in months, not years — with certainty of supply, bankable commercial terms, and sites engineered for industrial-grade uptime.
Each site is selected against a strict BTF-eligibility framework — verified generation capacity, correct zoning, transmission avoidance, and regulatory positioning assessed before any commercial engagement.
We work directly with gas generation operators to structure private wire arrangements that deliver power at the fence line under long-term, commercially bankable terms. No OEB retailer licence required — tenant executes PPA directly with generator.
Beyond power, we confirm diverse fibre paths — 100G/400G capable, connecting to major long-haul corridors — alongside water, road access, and zoning certainty. Everything a hyperscale tenant needs to underwrite a site.
Site control, ground lease or land purchase, power purchase framework, and full infrastructure coordination — from land identification to energized fence line. We act as developer of record throughout.
Fifteen years inside carrier and data centre infrastructure gives us a different starting point than developers who approach this from the real estate or finance side.
We speak the language of data centre operators, utility engineers, and IESO processes — giving us access to conversations that generalist developers don't reach.
Our site pipeline is built on real relationships with municipalities, regional economic development offices, and generation asset owners across Ontario.
Every site is evaluated against a BTF-eligibility framework from the outset — not retrofitted. Correct zoning, generation proximity, and transmission avoidance assessed before any engagement.
Diverse carrier paths on 100G/400G long-haul routes are confirmed as part of site qualification — not an afterthought. Critical for hyperscale underwriting criteria.
Direct engagement with Township and regional EDOs from day one — sites positioned within communities before they become public, not after opposition forms.
Structured as a land developer and infrastructure packager. No OEB retailer licence required. Tenant-to-generator PPA model eliminates regulatory complexity for all parties.
Our pipeline focuses exclusively on BTF-eligible locations — sites with verified generation capacity and a clear path to large-load delivery. Site-specific details available under NDA.
A high-potential generation corridor in Southwestern Ontario with significant gas-fired capacity exceeding 1,000 MW. Priority parcels are on correctly zoned industrial land — no rezoning required. Diverse fibre paths on 100G/400G capable long-haul routes being confirmed. Exceptional fundamentals for large-scale compute deployment.
Eastern Ontario is an emerging data centre destination supported by provincial infrastructure, proximity to federal demand anchors, and available land with improving power access. We are tracking BTF-compatible generation assets in this corridor for medium-to-large load deployment.
Additional BTF-eligible sites across Ontario are under NDA or in early diligence — evaluated in partnership with regional economic development offices and generation asset operators. Contact us for current availability.
Request Site PackageWeekly articles on the BTF model, Ontario energy markets, and the infrastructure realities behind data centre development — published on LinkedIn.
Why BTF arrangements from gas generation assets are unlocking sites that the traditional grid-connect model can't serve — and what that means for Ontario.
Read on LinkedInThe province has significant generation in the ground. The challenge is connecting it to demand — and where private wire thinking creates a new path forward.
Read on LinkedInPower gets all the attention, but diverse carrier-grade fibre connectivity is increasingly the criterion that separates viable hyperscale sites from everything else.
Read on LinkedInPower Velocity Infrastructure is an Ontario-incorporated data centre land development company focused exclusively on Behind-the-Fence power solutions for high-load users.
Our founder brings 15 years of carrier and data centre infrastructure experience working across major Canadian and US operators. That depth of operational knowledge shapes every aspect of how we identify sites, structure power arrangements, and engage with tenants.
We are not a real estate company that discovered data centres. We are infrastructure operators who understand the power problem from the inside.
"The power problem in data centre development is not a real estate problem. It is an infrastructure knowledge problem. We solve it from the inside out."
— Pawan Pahuja, Founder & Principal, Power Velocity Infrastructure
Whether you are a data centre operator seeking power-ready land, an investor evaluating the BTF opportunity, or a generation asset owner looking for a development partner — we want to hear from you.
Site-specific details including parcel information, generation capacity, and power pricing are available to qualified counterparties under a standard bilateral NDA.
We'll be in touch shortly. Thank you for reaching out to Power Velocity Infrastructure.